QUESTION 6: Do you think

Showing comments and forms 1 to 6 of 6

Comment

South Norfolk Village Clusters Housing Allocations Plan (Reg. 18 Draft)

Representation ID: 1391

Received: 02/08/2021

Respondent: East Suffolk Council

Representation Summary:

No comment on specific site but please consider infrastructure implications in East Suffolk.

Comment

South Norfolk Village Clusters Housing Allocations Plan (Reg. 18 Draft)

Representation ID: 1833

Received: 21/07/2021

Respondent: South Norfolk Council

Representation Summary:

SN00168 The Environmental Protection Team are not aware of any significant land quality issue with this site or adjacent land. However, having regard to the size of the site and sensitivity of the proposed development it is considered that a Phase One Land Contamination Report (Desk Study) should be required as part of any planning application.

The site is opposite to a commercial car repair garage which has a potential to have a negative impact on the amenity of the residents of any dwellings constructed on the site due to noise and odour/fumes. In addition, placing sensitive receptors close to this business cold impact its future viability. It is therefore considered that this will need to be addressed as part of any application for dwellings on this site.

Due to the size of this development and its proximity to existing dwellings, an application to develop this site is likely to attract the recommendation that standard planning condition AM05 Construction Management Plan be attached to any approval. It may be worth highlighting to applicants that to avoid any delay in discharging this condition, they may wish to include a Construction Management Plan with their application. If the submitted Construction Management Plan is adequate, the an alternative condition could be attached to any approval requiring its implementation.

Attachments:

Comment

South Norfolk Village Clusters Housing Allocations Plan (Reg. 18 Draft)

Representation ID: 1834

Received: 21/07/2021

Respondent: South Norfolk Council

Representation Summary:

SN00193 The Environmental Protection Team are not aware of any significant land quality issue with this site or adjacent land. However, having regard to the size of the site and sensitivity of the proposed development it is considered that a Phase One Land Contamination Report (Desk Study) should be required as part of any planning application.

The site is adjacent to a commercial car repair garage which has a potential to have a negative impact on the amenity of the residents of any dwellings constructed on the site due to noise and odour/fumes. In addition, placing sensitive receptors close to this business cold impact its future viability. It is therefore considered that this will need to be addressed as part of any application for dwellings on this site.

Due to the size of this development and its proximity to existing dwellings, an application to develop this site is likely to attract the recommendation that standard planning condition AM05 Construction Management Plan be attached to any approval. It may be worth highlighting to applicants that to avoid any delay in discharging this condition, they may wish to include a Construction Management Plan with their application. If the submitted Construction Management Plan is adequate, the an alternative condition could be attached to any approval requiring its implementation.

Attachments:

Comment

South Norfolk Village Clusters Housing Allocations Plan (Reg. 18 Draft)

Representation ID: 1835

Received: 21/07/2021

Respondent: South Norfolk Council

Representation Summary:

SN4011 The Environmental Protection Team are not aware of any significant land quality issue with this site or adjacent land. However, having regard to the size of the site and sensitivity of the proposed development it is considered that a Phase One Land Contamination Report (Desk Study) should be required as part of any planning application.

Due to the size of this development and its proximity to existing dwellings, an application to develop this site is likely to attract the recommendation that standard planning condition AM05 Construction Management Plan be attached to any approval. It may be worth highlighting to applicants that to avoid any delay in discharging this condition, they may wish to include a Construction Management Plan with their application. If the submitted Construction Management Plan is adequate, the an alternative condition could be attached to any approval requiring its implementation.

Attachments:

Comment

South Norfolk Village Clusters Housing Allocations Plan (Reg. 18 Draft)

Representation ID: 1836

Received: 21/07/2021

Respondent: South Norfolk Council

Representation Summary:

SN4031SL The Environmental Protection Team are not aware of any significant land quality issue with this site or adjacent land. However, having regard to the size of the site and sensitivity of the proposed development it is considered that a Phase One Land Contamination Report (Desk Study) should be required as part of any planning application.

Due to the size of this development and its proximity to existing dwellings, an application to develop this site is likely to attract the recommendation that standard planning condition AM05 Construction Management Plan be attached to any approval. It may be worth highlighting to applicants that to avoid any delay in discharging this condition, they may wish to include a Construction Management Plan with their application. If the submitted Construction Management Plan is adequate, the an alternative condition could be attached to any approval requiring its implementation.

Attachments:

Comment

South Norfolk Village Clusters Housing Allocations Plan (Reg. 18 Draft)

Representation ID: 1920

Received: 02/08/2021

Respondent: Water Management Alliance

Representation Summary:

See attachment for full response.
Part of the Parish is located within the Waveney, Lower Yare and Lothingland IDD.
The Board’s byelaws apply to any new developments within the IDD.

Attachments: