48.10

Showing comments and forms 1 to 3 of 3

Object

South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)

Representation ID: 2378

Received: 21/02/2023

Respondent: Ashwellthorpe & Fundenhall Parish Council

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

The main worry is that the footpath does not extend the whole length of New road. Another concern is the make up and entry point to the suggested site.

Change suggested by respondent:

as above

Object

South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)

Representation ID: 2408

Received: 23/02/2023

Respondent: Mr Graham Conway

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Whilst a singular Access would indeed be preferable, it would be too close to the blind bend at the current 30MPH limits up New Road. Traffic regularly speeds along New Road within the 30 MPH Limit and this would present a further danger to the inhabitants.Whilst there is inclusion of a footpath in front of the site, it is unclear if this would extend along New Road to the Street. There are intermittently narrow verges along this stretch and would be unsuitable for development of a foot path past the existing properties.

Change suggested by respondent:

Remove this from the Clusters proposal

Object

South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)

Representation ID: 2442

Received: 24/02/2023

Respondent: Ashwellthorpe & Fundenhall Parish Council

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

The new dwellings will be built on an area that floods every year and this must be dealt with before any new dwellings are built along with the pumping station being upgraded also before any further building takes place

Change suggested by respondent:

as above