Object
South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)
Representation ID: 2574
Received: 01/03/2023
Respondent: Wortwell Parish Council
Legally compliant? Yes
Sound? No
Duty to co-operate? No
Over dominance of numbers and size and a danger to the flow of traffic on High Road. A reduced proposal from the requested build down to five dwellings only would be acceptable
Reduction of housing proposal
Space to park, turn and enter and exit highway safely
The land next to the chapel opens onto High Road. Council wish to ensure that a layby arrangement off the road entrance be provided as part of the development to ensure no parking spills onto the High Road which is the main thoroughfare through the village. The land cannot sustain the number of houses proposed and would be a dominant new 'estate' in the middle of the village next to a listed building. The council does not object per se to a development here as it is a natural infil but the proposal is for too many dwellings. We consider 5 to be the maximum that this piece of land can support including parking and driveways and the ability to turn within the land rather than having to back onto a main road.
Support
South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)
Representation ID: 2832
Received: 06/03/2023
Respondent: Durrants
Please refer to detailed representations submitted on 6/3/23. In summary, we find the settlement limit for Wortwell to be sound. It allows for an allocation and modest infill in sustainable locations. Wortwell has the added benefit of being outside of the Nutrient Neutrality catchment and therefore represents an opportunity to compensate for inevitable under-delivery of housing in areas within the catchment elsewhere in the District.
Please refer to detailed representations submitted on 6/3/23. In summary, we find the settlement limit for Wortwell to be sound. It allows for an allocation and modest infill in sustainable locations. Wortwell has the added benefit of being outside of the Nutrient Neutrality catchment and therefore represents an opportunity to compensate for inevitable under-delivery of housing in areas within the catchment elsewhere in the District.
Object
South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)
Representation ID: 3180
Received: 01/03/2023
Respondent: Historic England
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Although this is not an allocated site in the Local Plan, the settlement limit is being amended to incorporate this land.
Although the land does not include any designated heritage assets, the site is located between two grade II listed buildings – the United Reform Church and 155 High Road. Therefore, any development of this site has the potential to impact upon the significance of these heritage assets.
There does not appear to be an HIA for this site. We recommend the preparation of an HIA for this site ahead of the EiP.
Notwithstanding this, we have some reservations about the approach to the extension of settlement limits because it is unclear how site-specific policy requirements e.g. mitigation measures recommended in an HIA, can be secured in the absence of a site-specific policy.
Prepare HIA
Thank you for consulting Historic England on the South Norfolk Village Clusters Local Plan Regulation 19 Draft Consultation. As a statutory consultee, our role is to ensure that the conservation of the historic environment is fully integrated into planning policy and that any policy documents make provision for a positive strategy for the
conservation and enjoyment of the historic environment.
Please also see our detailed comments in the attached table. We provide a summary of the main comments below.
SUMMARY
We very much welcome the completion of the Heritage Impact Assessments for a number of sites. The assessments have helped to inform many of the policies
providing helpful recommendations for mitigation and enhancement which is welcomed.
Whilst we consider many aspects of the plan to be sound, we have identified issues with some of the policies and site allocations which do compromise the overall soundness of the plan.
Under paragraph 35 of the NPPF some aspects of this Plan are unsound as they have not been positively prepared, are not justified, effective, or consistent with
national policy. We have identified below some of the key areas where we find the Plan unsound and what measures are needed to make the Plan sound. In summary we highlight the following four issues.
1. Heritage Impact Assessments
We are delighted to see that Heritage Impact Assessments have been prepared for
many sites. However, there are a few allocations where we recommend the preparation on an HIA now prior to EiP (e.g. VC BRO1 West, VC WOR1). The policy wording should then be amended accordingly. In the absence of an HIA we consider these sites are not sufficiently justified. There are also some settlement limit extensions where an HIA should also be prepared now ahead of EiP (e.g. SN0020SL, SN0588SL). Finally, there are some recommendations in HIAs that have not been incorporated into policy. The policies need to be amended to incorporate these HIA recommendations. This applies to a number of sites as set out in the attached table. Further details of all the relevant sites are given in Appendix A.
2. Settlement Limit extensions
We note that the smaller sites have not been included as allocations but instead the settlement limit has been extended to include that land. However, there are some extensions which would have an impact on the historic
environment and yet, in the absence of a site-specific policy, we are concerned about how the recommendations of the HIAs and any necessary mitigation/enhancement will be secured through an appropriate policy framework. The NPPF (para 16d) makes it clear that Plans should contain policies that are
clearly written and unambiguous, so it is evident how a decision maker should react development proposals. Further advice on the content of policies is given in the PPG at Paragraph: 002 Reference ID: 61-002-20190315 Revision date: 15 03 2019. It states that, ‘Where sites are proposed for allocation, sufficient detail should be given
to provide clarity to developers, local communities and other interested parties about the nature and scale of development’.
3. Archaeology Criterion
Many of the policies include an archaeology criterion which states that ‘The HER should be consulted to determine the need for any archaeological surveys prior to development’. Whilst we welcome the inclusion of a criterion for archaeology, in our view some
assessment is needed to inform any planning application (rather than waiting until after permission is granted but before development). This is consistent with the
policy set out in para 194 of the NPPF. We therefore advise that the archaeology criterion should be amended to read, ‘Planning applications should be supported by archaeological assessment including the results of field evaluation where appropriate.’ This applies to a number of sites in the Plan.
4. Site-Specific Issues
We have raised a number of quite site-specific issues in relation to the Bressingham, Little Melton, Rockland St Mary and Tasburgh sites. See the attached table for
further details of our concerns.
Closing comments
We have suggested a series of other changes to the Plan. Many of these changes suggested do not go to the heart of the Plan’s soundness, but instead are intended to improve upon it. We believe that these comments can be addressed by changes to wording in the plan.
In preparation of the local plan, we encourage you to draw on the knowledge of local conservation officers, the county archaeologist and local heritage groups.
Please note that absence of a comment on a policy, allocation or document in this letter does not mean that Historic England is content that the policy, allocation or
document is devoid of historic environment issues. We should like to stress that this response is based on the information provided by the Council in its consultation. To
avoid any doubt, this does not affect our obligation to provide further advice and, potentially, object to specific proposals, which may subsequently arise as a result of
this plan, where we consider that these would have an adverse effect upon the historic environment.
If you have any questions then please do get back to me. We suggest it would be helpful for us to meet and discuss our comments, resolve any outstanding issues and
begin to prepare a Statement of Common Ground. Please contact us to suggest some possible meeting dates.
Support
South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)
Representation ID: 3185
Received: 06/03/2023
Respondent: Durrants
The site was assessed by the Council to be a ‘reasonable’ addition to the existing settlement limit (May 2022), with capacity for around 8 dwellings.
The site scored ‘green’ against nearly all metrics, with any ‘amber’ areas deemed surmountable by the relevant consultees. The assessment concluded that the site was available and achievable, and that the highlighted landscape and heritage impacts could be addressed within a planning application. Any application would also need to be accompanied by a suitable ecological survey.
The landowners of the land within SN5045SL are able to confirm that the site remains available for development, and are confident that the issues highlighted within the site assessment, and summarised above, can easily be addressed through a planning application.
The site is in a sustainable location, forming an ‘infill’ gap, with residences on either side. It is a logical location for further housing development, and we would encourage the settlement boundary to be maintained in its proposed form within the final submission version of the Plan.
Wortwell has the added benefit of being outside of any Nutrient Neutrality catchment area, meaning any proposed housing can come forward without delay, unlike in some other villages within the District. SN5045SL is therefore highly deliverable and could provide much-needed housing when allocations within the catchments are delayed.
The proposed settlement boundary for Wortwell is sound and legally compliant.
The site to the north east of High Road, Wortwell (SN5045SL) was submitted for consideration through the Call for Sites process and was assessed by the local authority to be a ‘reasonable’ addition to the existing settlement limit (May 2022), with capacity for around 8 dwellings.
The site scored ‘green’ against nearly all metrics, with any ‘amber’ areas deemed surmountable by the relevant consultees. The assessment concluded that the site was available and achievable, and that the highlighted landscape and heritage impacts could be addressed within a planning application. Any application would also need to be accompanied by a suitable ecological survey.
The landowners of the land within SN5045SL are able to confirm that the site remains available for development, and are confident that the issues highlighted within the site assessment, and summarised above, can easily be addressed through a planning application.
The site is in a sustainable location, forming an ‘infill’ gap, with residences on either side. It is a logical location for further housing development, and we would encourage the settlement boundary to be maintained in its proposed form within the final submission version of the Plan.
Wortwell has the added benefit of being outside of any Nutrient Neutrality catchment area, meaning any proposed housing can come forward without delay, unlike in some other villages within the District. SN5045SL is therefore highly deliverable and could provide much-needed housing when allocations within the catchments are delayed.