Object

South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)

Representation ID: 2361

Received: 17/02/2023

Respondent: Williams/Harrod

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

- The development of VC GIL1 (south of Geldeston Road, The Street) will not enhance the rural community. The allocation of the site for up to 35 dwellings would represent gross over-development of a Service Village, particularly when taken alongside the previous development 2022/1897 at Fieldgate Reach (Daisy Way and Tulip Close) which was completed only in summer 2022.

Change suggested by respondent:

The plan to develop further houses on this flood plain needs to be scrapped. If houses are still to built against all the concrete evidence against it, there should at least be access from a different point i.e. not through The Street and thus not through Daisy Way.