We can confirm that we have network assets crossing the site. The policy should remove the word 'possible' to provide certainty. Our draft DWMP states that the medium-term strategy to 2035 for Ditchingham WRC is transfer between catchments and using SuDS as part of a mixed strategy to address surface water flows into our networks. Given the scale of development we do not consider that there needs to be a policy requirement for phasing in relation to upgrades to the receiving WRC.
Change suggested by respondent:
Modify policy text to read:
Early engagement with Anglian Water (AW) to identify infrastructure crossing the site.