Object
South Norfolk Village Clusters Housing Allocations Plan (Reg. 18 Draft)
Representation ID: 1270
Received: 01/08/2021
Respondent: Mr Jason Carter
Representation Summary:
I can see lots of flooding issues coming to Gillingham if these houses are built.The contractors on the current site GIL1&2019/1013 have already had to do surface water drainage off the site twice into the ditches.Also where SN0274 REV A and REV B shortlisted sites are ,has been flooded recently and a new ditch has had to been put in to get rid of the water and this is summer time.