Object

South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)

Representation ID: 2379

Received: 21/02/2023

Respondent: Ashwellthorpe & Fundenhall Parish Council

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Their are extra concerns on extra capacity on the sewage now passing along the street and in both directions will cause many issues with this causing the pumping stations to not be able to cope with the extra sewage. The current sewer is at a high level on the street making the flow very insecure and is subject to flooding. the gulley's across the street has natural flow of water along new road which means in time of high rainfall the parishioners gardens flood. the current sewer leaks either from households or land drainage and Anglian water are aware

Change suggested by respondent:

The sewage system for the whole village needs a full update and is imperative if the new dwellings go ahead to ensure the flooding issue is dealt with before the building on the new site commences.