Support

South Norfolk Village Clusters Housing Allocations Plan (Reg. 19 Pre-submission Draft)

Representation ID: 3097

Received: 04/03/2023

Respondent: Mr Roger Pye

Agent: Mr Magnus Magnusson

Representation Summary:

My client supports the inclusion of their land within the settlement boundary and can confirm that the land remains available and appropriate for windfall development.

Change suggested by respondent:

No modification to the Plan but in respect of the Council’s site assessment as this appears at appendix B, my client would like to make the following points for consideration within the context of the emerging VCHAP and the HELAA as an when this evidence base document is next updated:
Part 3 - Access to the site. There is an existing gateway (access) onto The Street and approximately 6-8 meters from the sites Southern boundary. This was the original gateway for machinery etc. onto the field on the northern side of the footpath and can be reinstated to serve any
development on the site. Furthermore, there is considered to be appropriate visibility both northwards and southwards along The Street from this point of access.
Part 3 - Better Broadband for Norfolk – It is identified that the site lies outside of the proposed fibre installation area. My client has a 'tail' into the B4RN fibre broadband network on the plot at the northern end and the
main cable runs along the western fence line to the southern boundary.
Part 3 - Utilities infrastructure – My client was not aware that there were sewers crossing this site and indeed, considers this not to be the case.

Attachments: