Object

South Norfolk Village Clusters Housing Allocations Plan (Reg. 18 Draft)

Representation ID: 706

Received: 27/07/2021

Respondent: Mrs Shirin Salt

Representation Summary:

Flooding caused by surface water and poor drainage has already proved to be a problem and is worsening.
Traffic along The Street is already a problem with many residents not having off-street parking. Since the new development in Geldeston and the current Gillingham development site the increased volume of traffic has made this area a major problem and this is before the current development is inhabited.
Over subscribed schools, doctors and dentists.
Destruction of the rural nature of the village and the current way of life as well as destruction of the established flora and fauna.