Object

South Norfolk Village Clusters Housing Allocations Plan (Reg. 18 Draft)

Representation ID: 761

Received: 28/07/2021

Respondent: Mr stephen hubbard

Representation Summary:

The infrastructure is not in place to cope with a development of this size, school road is not fit for purpose both for extra traffic and has serious drainage issues which will be exacerbated by extra run off.
Safety issues with a car park for the school being proposed for the opposite side of the road are obvious, and construction traffic for a 2-3 year period can have serious consequences with school traffic.
It will be uneconomic, the facilities are not adequate, a housing estate is not needed, a wildlife habitat will be eliminated.
PLEASE DO NOT SPOIL MY VILLAGE