Comment
Village Clusters Housing Allocations Plan - Alternative Sites & Focused Changes (Reg. 18)
Representation ID: 3285
Received: 23/12/2023
Respondent: Mr Gary Howard
Representation Summary:
Widen the road (wheel Road) and improve the routes in and out of the village to accommodate the construction traffic initially and then the extra load once the houses are built. Public footpath to the school for safe pedestrian access.
Full text:
Widen the road (wheel Road) and improve the routes in and out of the village to accommodate the construction traffic initially and then the extra load once the houses are built. Public footpath to the school for safe pedestrian access.