Village Clusters Housing Allocations Plan - Reg. 19 Pre-submission Addendum

Ended on the 7 October 2024

(2) Part 2, Schedule of other major changes

Section/ Cluster

January 2023 Regulation 19 Para/Policy Number

Proposed Change

The GNLP

1A.10

See tracked changes update below.

Monitoring

New paragraph after 1A.35

Once development on a Village Cluster Plan allocation site is complete, it will be considered to be inside the Settlement Limit for the purposes of future planning applications and decisions.

Aslacton, Great Moulton and Tibenham

Para 3.16

The site is 0.75 0.62ha and allocated for at least 12 dwellings...

VC GRE1

-

0.75 0.62ha of land is allocated for at least 12 dwellings.

Brooke, Kirstead and Howe

Para 8.13

The allocation of a site of 2.2 2.47ha for up to 50 dwellings allows for

VC BRO1

-

2.2 2.47ha of land is allocated for up to 50 dwellings.

Bunwell

VC BUN1

  • Early engagement with Anglian Water to identify possible infrastructure crossing the site, and the capacity to connect to the current vacuum sewer system, as well as the need to determine the capacity of the receiving Water Recycling Centre (WRC), and the consequent potential need to phase the site until capacity is available.

Para 9.15

-

An area of 1 0.85ha of land is allocated for approximately 20 dwellings.

VC BUN2

-

1 0.85ha of land is allocated for approximately 20 dwellings.

VC BUN2

-

  • Site layout and design includes an area of open space to the south-east of the site to protect the residential amenities of existing and future occupiers, and to retain some long views across the site to the north and north-east

VC BUN2

-

  • Site layout and design to respond appropriately to the designated heritage assets to the north-west of the site (Bunwell Manor Hotel and The Cottage) including through the use of appropriate materials, landscaping and boundary treatments.

VC BUN2

-

  • Early engagement with Anglian Water (AW) to identify possible infrastructure crossing the site and regarding the capacity to connect to the current vacuum sewer system, as well as the need to determine the capacity of the receiving Water Recycling Centre (WRC), and the consequent potential need to phase the site until capacity is available.

Carleton Rode

VC CAR1

0.3 0.19 hectares is allocated for housing and associated infrastructure for approximately 3 dwellings.

Kirby Cane and Ellingham

Para 22.10

The allocation of 1.87 1.63ha of land for approximately 25 dwellings is reasonable ...

VC ELL1

-

1.87 1.63ha of land is allocated for approximately 25 dwellings.

Little Melton

Para 23.13

Although the site is 3.00 3.80ha ...

VC LM1

-

3.00 3.80ha of land is allocated for approximately 35 dwellings.

VC LM1

-

  • Early engagement with Anglian Water regarding the need to phase development within the catchment of Whitlingham Water Recycling Centre.

Needham, Brockdish, Starston and Wortwell

VC WOR1

  • The preparation of a site-specific Flood Risk Assessment (FRA) and strategy to inform mitigation measures and the layout/development of the site, which has regard to the issues identified in the Stage 2 VC Strategic Flood Risk Assessment. Specifically, this will need to address the concerns over meeting the requirements of part b) of the exception test for the land south of High Road;

VC WOR2

-

0.4 0.52 hectares of land is allocated for housing and associated infrastructure for approximately 5 dwellings.

Thurlton and Norton Subcourse

Para 40.13

The site is allocated for at least 12 dwellings on an area of 0.57 0.78ha ...

VC THU1

-

0.57 0.78ha of land is allocated for at least 12 dwellings.

Para 40.17

-

The Lead Local Flood Authority has identified a surface water flow path adjacent to the site. Whilst it does not impact on development of the site its presence should be noted in the preparation of a planning application. The Stage 2 VC Strategic Flood Risk Assessment also identified a limited area of surface water ponding in the southern part of the site. As such the developer of the site will need to prepare a site-specific Flood Risk Assessment (FRA) and strategy to inform mitigation measures and the layout/development of the site.

VC THU2

-

  • The preparation of a site-specific Flood Risk Assessment (FRA) and strategy to inform mitigation measures and the layout/development of the site, which has regard to the issues identified in the Stage 2 VC Strategic Flood Risk Assessment;

Toft Monks, Aldeby, Haddiscoe, Wheatacre and Burgh St Peter

VC HAD1

3.01 3.13hectares of land is allocated for up to 35 dwellings.

VC HAD1

-

  • Early engagement with Anglian Water regarding connecting to the local water recycling network the capacity of the receiving WRC and the requisitioning to new sewers and any consequent need to phase the delivery of the site.

VC HAD1

-

  • Appropriate landscaping of the site to reflect its sensitive location, including the retention, protection and reinforcement of the existing trees and hedgerows to the east and west boundaries of the site and the introduction of an appropriate boundary to the south of the site, which both visually contains the site and reflects the rural nature of the location, plus protection of the TPO trees on the A143 (northern) boundary;

Winfarthing & Shelfhanger

VC WIN1

  • Early engagement with Anglian Water regarding connecting to the local water recycling network.

VC WIN2

-

  • Early engagement with Anglian Water regarding connecting to the local water recycling network.

Wreningham, Ashwellthorpe & Fundenhall

Para 48.11

However, a site-specific Flood Risk Assessment (FRA) will be required for the site and will need to have regard to the matters raised in the Stage 2 SFRA, with particular reference to access and egress for emergency vehicles along New Road during AEP flood events.

Para 48.14

-

An area of 0.89 1.09ha is allocated for up to 15 dwellings ...

VC ASH1

-

0.89 1.09ha of land is allocated for up to 15 dwellings.

VC ASH1

-

  • Retention and protection of the Priority Habitats and mature trees along the west and south site boundaries and within the site to minimise the visual impact of the development. and the Enhancement of the existing vegetation along the north boundary to protect the amenities of future and existing residents.

Appendix C

Housing Trajectory

See tracked changes update below.

Throughout

Various

Minor factual updates to reflect issues such as the latest position on the Evidence Base studies, the publication of an updated NPPF in December 2023, the adoption of the Diss and District Neighbourhood Plan in October 2023 and the GNLP in March 2024.

(3) Table at paragraph 1A.10:

Source

Dwellings

New Village Cluster Plan Allocations

1,2041,102

Carried Forward 2015 Allocations

Net Gain of 4

2015 Allocations not carried forward

Loss of 13

Neighbourhood Plan Allocations

135

Total

1,3301,228