Village Clusters Housing Allocations Plan - Main Modifications document

Ends on 26th October 2026 (41 days remaining)

Cluster 47: Woodton & Bedingham


MM65 Comment

Page 205

Policy/Paragraph

VC WOO1

Main Modification

Amend policy criterion to read:

  • Early engagement with Anglian Water to ensure that there is adequate capacity, or capacity can be made available, in the local water recycling network. regarding the need to phase the site to address capacity issues with both the Water Recycling Centre and the local sewer network.

MM66 Comment

Page 203

Policy/Paragraph

47.4

Main Modification

Make updates to the following paragraph and update the Woodton Policy Map to reflect modifications to the settlement limit:

The Settlement Limit has been drawn to include the main built form of the settlement, including the ribbon development north along The Street and the 2015 WOO1 allocation. A minor addition to the Settlement Limit north of Church Road has also been included around a short row of residential properties, close to VC WOO1.


For instructions on how to use the system and make comments, please see our help guide.
back to top back to top